Power Boiler Process -OKI Commissioning

Date: Jun 24, 2025

Location: OKI Baung Mill, Sumatera Selatan, Indonesia

Company: ASTAR

Job Description:

  • Daily operation management of boiler and on-site inspection, DCS supervision and assessment, and daily operation log/report sign-off;
  • Ensure all power plant are always in ready condition to meet the energy demand of the mil, to support smooth production running.
  • Ensures that energy usages (electricity, steam) are monitored and maintained as per target.
  • Plans energy generation in coordination with production.
  • To lead the whole team to implement various rules and regulations and emphasize the discipline of the team;
  • Develops and plan energy scenario that results most efficient and economical energy (electric & steam) to reduce energy cost.
  • Dynamic understanding, communication and coordination of boiler operators;
  • To complete the assessment of team members of the previous month in the beginning of each month;
  • To perform boiler equipment/environmental improvement cases in accordance with the instructions of the supervisor;
  • Execution management of the MBOS activity of the boiler operation team;
  • Responsible for the examination and approval of work tickets and operation tickets; supervision and implementation of the safety measures for major equipment maintenance;
  • To hold a safety meeting every day, paying attention to industrial safety and prevention constantly, and summarizing the work of this class.