Operator, RBVE OKI Commissioning
Date: Jul 5, 2025
Location: OKI Baung Mill, Sumatera Selatan, Indonesia
Company: ASTAR
-
Monitor and ensure the smooth operation of the production process and equipment condition in the field according to work regulations.
-
Monitor, clean, and adjust the damper of the Primary Windbox on a scheduled basis as needed and according to the condition of the smelt spout.
-
Clean the smelt spout and mini hood every 60 minutes.
-
Clean the spray guns every 60 minutes.
-
Drain the mixing tanks once per shift, coordinating with DCS if necessary, to ensure the drainage system is not clogged.