HE Crane Rigger OKI Commissioning
Date: Oct 20, 2025
Location: OKI Baung Mill, Sumatera Selatan, Indonesia
Company: ASTAR
- Implement the safety awareness, hazards/risk identification and 6K consistently at work area.
- Assist to crane operator by giving hand signal during lifting materials for safely operation, no personnel injury and property damage.
- Carry out to use proper lifting gear required based on lifting plan and fasten binding material secure prior to lifting.
- Check lifting gears prior start to lifting the material every day and must be operated within the safe working load (SWL).
- Cleaning and greasing of crane unit, checking and stored the lifting gears every day after used to designated area.
- Implement and follow the JSA, PTW, SOP & WI available during working activities.
- Filling the time sheet after get approval from user every finish the work everyday.
- Wearing the appropriate PPE during carry out activities.